Water TreatmentNew Construction

Seawater Desalination Project

Client: A Water Groupcases.location: Saudi Arabiacases.year: 20258/16/2026

Challenge

The seawater desalination project operates in a highly corrosive seawater environment, requiring duplex stainless steel valves that can withstand chloride corrosion over long-term service.

Our Solution

Apexlong supplied 2205 duplex stainless steel butterfly valves and check valves, specifically selected for their superior resistance to chloride stress corrosion cracking in seawater applications.

Results

The desalination plant now produces 500,000 tons of fresh water per day, with all valves operating with zero failures since commissioning.

Project Overview

Supplied 2205 duplex stainless steel butterfly and check valves for a seawater desalination project in Saudi Arabia.

Project Overview

Apexlong supplied duplex stainless steel valves for a large-scale seawater desalination project in Saudi Arabia.

Challenge

The project required valves capable of resisting chloride corrosion in a seawater environment over the long term.

Solution

We provided 2205 duplex stainless steel butterfly valves and check valves for superior chloride corrosion resistance.

Results

Daily production of 500,000 tons of fresh water with zero valve failures.